August 2008_Updates

Guest House
Plastering of all the rooms has since been completed and the plumbing work has now commenced. To date all the toilet seats have now been fitted in all the bathrooms and all the drainage pipes outside have since been put in place.


We made a trip to Botswana and purchased all the ceiling boards and the ceiling fittings.


Electricity
We have purchased all the material now for the distribution of the electricity inside the school premises and the holes have already been dug, we just need to go and collect the poles.



Classrooms
We had a meeting with the Engineer and he even came to see the land and he said the land is now ready for construction so the builders will soon start to mark the places where they will dig the foundation and the columns of the school block.

The Engineer is now working on the Structural Design of the proposed school building and we have already signed an agreement and a contract that by Friday the 29th he should be done. We will then order the steel from South Africa as soon as we get the actual sizes and quantities from the Engineer.


In the mean time we are busy gathering the river sand and the three-quarter stones to be used for the concrete footing, with our truck we need a total of 200 loads of each.